Skip to content

keep ruff happy

keep ruff happy #17

Triggered via push September 16, 2025 10:58
Status Failure
Total duration 17s
Artifacts

ci.yml

on: push
Matrix: tests
pre-commit
11s
pre-commit
coverage
0s
coverage
Fit to window
Zoom out
Zoom in

Annotations

8 errors
tests (3.12)
Process completed with exit code 2.
tests (3.11)
Process completed with exit code 2.
tests (3.11)
The strategy configuration was canceled because "tests._3_12" failed
tests (3.10)
Process completed with exit code 2.
tests (3.10)
The strategy configuration was canceled because "tests._3_12" failed
tests (3.13)
The operation was canceled.
tests (3.13)
The strategy configuration was canceled because "tests._3_12" failed
pre-commit
Process completed with exit code 1.